Position: 首頁>Home>Products>Water filling and production line>Small bottle water filling machine (330-1500ml)

Products
PET bottled mineral water production line
Product introduction


The PET bottled mineral water production line of Renyu Machinery is mainly applicable to the filling operation of drinking water. It is commonly used for the production of pure mineral water, mountain spring water, soda water, etc. such as PET bottles, polyester bottles, plastic bottles, etc. It can achieve 330-1500ml compatibility on one machine, and the output is 2000-36000 bottles/hour.

The control system integrates flushing, filling and capping. The whole machine is automatically controlled by PLC, with stable performance, safety and reliability. The man-machine interface is simple and intelligent, and it is easy to replace different capacities.

Bottle feeding bottle transmission adopts the bottleneck technology. It is unnecessary to adjust the height of the equipment to change the bottle shape. It is only necessary to replace the arc guide plate related to the diameter of the bottle body. It is only necessary to replace a few star wheels to change the bottle shape. The arc guide plate can be realized;

After the bottle washing bottle enters the host machine, it enters the bottle washing machine through the transmission star wheel. The bottle clamp clamps the bottle mouth and turns 180 ° upward along the bottle washing guide rail, making the bottle mouth downward. In the specific area of the bottle washing machine, the nozzle of the bottle holder sprays sterile water to wash the inner wall of the bottle. After the bottle is washed and drained, it will be turned down 180 ° along the guide rail under the bottle clamp to make the mouth of the bottle upward. The cleaned bottle is led out from the bottle washing machine through the stainless steel wheel and transferred to the next filling.

The bottle that is filled and rinsed is led from the bottle washing section to the filling section through the bottle pulling star wheel Bottles entering the filling section are forked by the bottle neck, and can be lifted, maintained and lowered by the lifting mechanism under the action of the cam. During the operation, the bottle is jacked open by the filling valve, and filled by the closed filling method. The output adjustment is controlled by the frequency converter. The high-speed filling valve is used to control the liquid level accurately with small error.

After the capping and filling is completed, the bottle enters the capping machine through the transmission star wheel, and the anti rotation knife on the capping machine blocks the bottleneck, which together with the external bottleneck guard plate of the capping machine keeps the bottle upright and prevents rotation. The capping head rotates and rotates under the driving of the capping machine's main shaft. Under the action of the cam, the capping head can realize the actions of grasping, capping, capping and decapping, and complete the whole capping process. The capping head adopts a magnetic constant torque device. When the capping head takes off the cover through the capping disc, the top cover sleeve will hold the cover and straighten the cover to ensure the correct position of the cover in the capping die and the quality of the capping. When the capping is completed, the capping head overcomes the magnetic slipping and will not damage the cap. At the same time, when the capping head rises, the top cap rod will eject the cap from the capping die.

PET bottled mineral water production line process: water treatment system → bottle blowing machine → bottle sorting machine → air supply channel → three in one filling machine (bottle washing, filling, capping, including upper capping machine, online cap disinfection) → light inspection box → labeling machine (labeling) → shrinking machine → coding machine → film packaging machine (packing machine) → palletizer → finished product



Video display

Show details
  • Technical parameter

    Product model

    rinse

    filling

    seal

    Rated output(500ml)

    power

    Equipment dimensions

    CGF8-8-3

    8

    8

    3

    2000-3000BPH

    2.2

    1900*1450*2100mm

    CGF14-12-5

    14

    12

    5

    4000-5000BPH

    2.2

    2600*2100*2200mm

    CGF18-18-6

    18

    18

    6

    6000-8000BPH

    3

    2700*1900*2300mm

    CGF24-24-8

    24

    24

    8

    11000-13000BPH

    4

    2940*2300*2300mm

    CGF32-32-10

    32

    32

    10

    15000-18000BPH

    5.5

    3750*2900*2300mm

    CGF40-40-12

    40

    40

    12

    22000-24000BPH

    5.87

    4450*3100*2300mm

    CGF50-50-15

    50

    50

    15

    2800o-30000BPH

    7.87

    5450*3300*2500mm

    CGF60-60-18

    60

    60

    18

    35000-36000BPH

    7.87

    6500*4500*2900mm


    Renyu After sales

    1. Technical data Our company provides the equipment layout plan according to the workshop plan provided by the buyer. The technical data accompanying the shipment include: packing list (shipping list), equipment instructions; Operation and maintenance manual; Electrical schematic diagram, and wearing parts within the warranty period (12 months).

    2. After the door-to-door installation and commissioning equipment arrives at the buyer's factory, we will arrange technicians for door-to-door installation, commissioning and trial production, and reach the design capacity within the planned time. During the installation and commissioning, our company is responsible for providing corresponding spare parts.

    3. The technical personnel shall be trained to help the relevant personnel of the production line of the Demander to be familiar with the process and principle of the production line, and the equipment operation and maintenance specifications, until the post personnel can master them independently and skillfully.

    4. Quality assurance The quality indicators of mechanical equipment shall be in accordance with the national or relevant industrial standards. The company guarantees that the goods provided are brand new, unused, manufactured with the latest design and appropriate materials, and conform to the quality, specification and performance specified in the contract in all aspects. The company guarantees that the production line will reach the technical performance index of the product within the time agreed by both parties after its correct guidance of installation and commissioning.

    5. After the acceptance of equipment maintenance and technical upgrading, 12 month warranty will be provided for the equipment, 12 month warranty will be provided for the control system, and free parts and timely and effective services will be provided. In case of equipment failure, the maintenance personnel shall arrive at the site within 36 hours after receiving the user's information and eliminate the failure in time. After the warranty period, extensive and preferential technical support can be provided for life.

    6. The packaging and transportation packing box shall be a new and solid special packing box conforming to the Chinese immune standard, which is suitable for long-distance transportation, moisture-proof, rust proof, shockproof, and rough handling, as well as sea and land transportation and overall hoisting.



    Related Products